SCA Obbola – New Recycled Fiber Line in an Operational Environment

Projekt Obbola

In one of our most intensive and technically challenging assignments, WP Welding was a key partner to SCA in the Expansion Obbola project – a major industrial project outside Umeå. The goal was to build a new recycled fiber line to double the production capacity of recycled paper for SCA’s new paper machine.

We joined the project’s final phase in November 2022 and had up to 80 personnel from various disciplines on site during the execution. The work was carried out in an existing facility, simultaneously with parts of the factory still in operation – demanding high levels of planning, safety, and flexibility.

Our assignment included:

  • Installation in an active production environment

  • Pipe and steel work

  • Coordination between multiple technical disciplines

Thanks to close collaboration with SCA, we delivered our part of the project on schedule — with high quality and excellent results.

We are impressed by how solution-oriented WP Welding is and their ability to staff up with skilled personnel on short notice. They contributed greatly to making this intensive project run smoothly and successfully.
– Oskar Persson, Installation Manager, SCA Obbola.

A contribution we are proud to have been part of.